The on-site duration of a foundation repair depends significantly on the method required to stabilize your home. While the total project timeline—including engineering and permitting—often spans 5 to 8 weeks, the actual time our crews spend working at your property is generally much shorter.

Typical on-site installation timelines include:

  • Crack Injection Repairs: These are often completed in a single day and require no curing hold, making them the fastest solution for minor structural issues.
  • Basement Wall Stabilization: These projects typically take between 2 to 5 days to complete.
  • Residential Helical Pier Installation: For a standard project involving approximately 12 piers, the on-site work generally takes 5 to 8 days.

Our installation process for Helical Pier Systems is divided into five efficient phases: site preparation (including digging trenches 3–4 feet deep for exterior work), pier positioning, hydraulic driving, bracket installation, and backfilling. We use real-time torque monitoring during the drive to verify that each pier has engaged competent soil and meets the required design loads per ICC-ES AC358 standards.

For interior work, we utilize low-profile tooling that can operate in spaces with as little as 4 feet of headroom, allowing us to complete repairs without requiring you to move out of your home.