Property grading is a critical step in foundation maintenance because it redirects runoff away from your home instead of allowing it to pool against the exterior walls. By reshaping the soil to slope downhill from the building, we ensure that rain and melted snow roll off the landscape rather than seeping into the foundation or causing soil erosion.
To implement effective grading, we recommend following these practices:
- Use Fill Dirt: Add fill dirt rather than mulch or other lightweight materials to fill holes beside your foundation. Mulch can hold moisture and creep into siding gaps, which may lead to moisture traveling behind sheathing.
- Create a Downward Slope: Ensure the highest point of the soil sits directly against the structure, then pat down the earth to prevent settling. You can verify the angle by placing a level on a straight board set against your siding.
- Maintain the Ground-to-Siding Gap: Once the landscape is sloped, ensure there is a proper vertical gap between the finished grade (soil or mulch) and the bottom edge of your siding. This prevents wet soil from splashing under the siding and damaging wall framing.
For persistent issues or complex projects, we recommend consulting a structural engineer or our Engineering Excellence and Design Support team for site-specific guidance. Installations must always comply with applicable building codes and ICC-ES acceptance criteria.
Related FAQs
-
What are the Most Effective Ways to Redirect Water Away from a Home’s Foundation?
Read More »: What are the Most Effective Ways to Redirect Water Away from a Home’s Foundation?Effective moisture management begins with controlling how rainwater interacts with your foundation. We recommend a multi-step approach to ensure every drop is directed away from your home: For persistent issues, we provide waterproofing solutions, including sump pumps and drain products,…
-
Are Screw Piles More Cost-effective than Concrete for Foundation Repair Projects?
Read More »: Are Screw Piles More Cost-effective than Concrete for Foundation Repair Projects?Whether screw piles are more cost-effective than concrete depends on your specific site conditions, soil composition, and structural design. While Helical Pier Systems often have higher upfront material costs due to the use of high-strength galvanized steel, they deliver significant…
-
How does the Installation Speed of Screw Piles Compare to Traditional Concrete Foundations?
Read More »: How does the Installation Speed of Screw Piles Compare to Traditional Concrete Foundations?When comparing foundation methods, we find that the installation speed of helical screw piles is significantly faster than traditional concrete. While a conventional concrete foundation can take between 2 to 4 weeks to complete due to the necessary 7 to…
-
How Quickly can Helical Pile Foundations for Light Poles be Installed Compared to Poured Concrete?
Read More »: How Quickly can Helical Pile Foundations for Light Poles be Installed Compared to Poured Concrete?Installing helical pile foundations for light poles is significantly faster than using poured concrete, typically reducing the project timeline by weeks. We can complete a helical pile installation in just 1 to 2 days, whereas traditional poured concrete foundations often…
-
Why are Helical Piers a Better Choice for Parking Lot Light Pole Foundations Compared to Traditional Concrete Piers?
Read More »: Why are Helical Piers a Better Choice for Parking Lot Light Pole Foundations Compared to Traditional Concrete Piers?Helical piers offer a superior alternative to traditional concrete piers for parking lot light pole foundations due to their speed, immediate reliability, and minimal site impact. Unlike concrete, which requires extensive excavation, formwork, and a 7- to 28-day curing period,…