To stabilize a sinking garage foundation, we use Helical Pier Systems to transfer the structural weight of the garage away from failing surface soils and down to deeper, load-bearing strata. This process provides permanent stability where shallow soils can no longer support the structure.
The installation follows a precise professional sequence:
- Site Preparation and Excavation: We expose the existing footing, typically excavating 3 to 4 feet deep to reach the base of the foundation.
- Strategic Positioning: Using compact equipment that requires as little as four feet of headroom, we position the helical lead section under the footing.
- Hydraulic Rotation: We drive the pier shaft into the ground using hydraulic rotation. During this phase, we utilize real-time torque monitoring to verify that each pier reaches the exact engineered load specification required for your specific site.
- Bracket Attachment: Once the pier reaches the target torque value and depth, an underpinning repair bracket is secured to the pier and the existing concrete footing.
- Lift and Load Transfer: Using hydraulic equipment, the foundation is raised back to its correct level according to engineering plans. The structural load is then transferred through the brackets onto the piers.
This method is highly efficient as it avoids the long curing times associated with traditional concrete repairs. Because we adhere to ICC-ES AC358 standards, you can be confident that the repair is both safe and compliant with building codes.
Note: Before beginning, it is essential to consult a structural engineer. Through our network of structural engineers and Engineering Excellence and Design Support, we can help you obtain the required soil evaluations and load calculations to ensure a successful repair.
Related FAQs
-
How can I Distinguish between Normal, Harmless Settling in a New Build and Problematic Structural Movement?
Read More »: How can I Distinguish between Normal, Harmless Settling in a New Build and Problematic Structural Movement?Differentiating between normal settling and problematic movement in a new home involves examining the size, shape, and frequency of specific indicators. Most new buildings experience some degree of uniform, vertical movement as the soil compresses, which is typically acceptable. Normal,…
-
What are the Most Common Early Warning Signs of Foundation Settlement in a New Construction Home?
Read More »: What are the Most Common Early Warning Signs of Foundation Settlement in a New Construction Home?While all new homes experience some degree of natural settlement as the soil compresses, distinguishing between normal curing and problematic movement is essential for maintaining your property’s structural integrity. In new construction, the most common early warning signs of significant…
-
What is the Relationship between Installation Torque and Soil Bearing Capacity?
Read More »: What is the Relationship between Installation Torque and Soil Bearing Capacity?Installation torque is used as a real-time indicator of soil bearing capacity because the rotational resistance encountered by the helix plates reflects the soil’s shear strength. As the helical pier advances into competent strata, the torque required to turn it…
-
How do Engineers Calculate the Ultimate Geotechnical Capacity of a Helical Pile?
Read More »: How do Engineers Calculate the Ultimate Geotechnical Capacity of a Helical Pile?To calculate the ultimate geotechnical capacity of a helical pile, we utilize two primary methodologies: the individual bearing method and the torque factor method. These approaches allow us to ensure structural loads are successfully transferred to competent bearing strata. $Q_{ult}…
-
Why is a Geotechnical Investigation Necessary to Verify Soil Bearing Capacity?
Read More »: Why is a Geotechnical Investigation Necessary to Verify Soil Bearing Capacity?A geotechnical investigation is essential because it provides the site-specific data required to identify competent bearing strata and accurately size helical pier systems. Relying on general benchmarks is insufficient because actual soil bearing capacity varies significantly based on moisture content,…