We recommend steel piers over polyurethane foam when a permanent, engineered structural solution is required. While polyurethane foam is an effective tool for filling voids and performing minor, non-structural lifts for concrete slabs (typically under 2 inches), it is not a permanent fix for structural foundation settlement.
Our advanced earth anchoring systems are designed to address the root cause of settlement by transferring building loads past unstable surface soils down to competent load-bearing strata or bedrock. There are three primary reasons why our engineering team and network of structural engineers prefer steel systems:
- Superior Load-Bearing Capacity: Steel helical or push piers can support loads exceeding 100 tons per pier. In contrast, polyurethane foam is generally limited to lifting slabs and supporting lighter loads, typically under 20 tons.
- Stability in Expansive or Wet Soils: In environments with high moisture or expansive clay, shallow solutions like foam can be compromised by soil movement. Steel piers bypass these active zones entirely, providing long-term durability that foam cannot match.
- Permanent Underpinning: Unlike foam, which may degrade or require re-application over time, our ICC and ISO Certified products provide a permanent foundation repair solution. Steel systems are the industry standard for perimeter foundations, load-bearing walls, and commercial columns.
Because every project presents unique geotechnical challenges, we provide Engineering Excellence and Design Support to ensure the right system is utilized.
Consult a structural engineer or the manufacturer’s engineering team for project-specific design and installation guidance. Products are certified to ICC/ISO where indicated — installations must comply with applicable building codes and ICC-ES acceptance criteria (AC358).
Related FAQs
-
How can I Tell if my Seawall Needs Structural Repair or Just Cosmetic Maintenance?
Read More »: How can I Tell if my Seawall Needs Structural Repair or Just Cosmetic Maintenance?Determining whether a structure requires professional repair versus cosmetic maintenance begins with a thorough structural assessment by an engineering team. You should consult a structural engineer or the manufacturer’s engineering team to conduct project-specific load testing and site analysis to…
-
How do I Get Certified in Helical Pier Installation?
Read More »: How do I Get Certified in Helical Pier Installation?To become certified in helical pier installation, you should follow the structured training program provided by Helical Technology. The certification process includes the following steps: Preparation: Complete necessary fieldwork preparation, download design software to model load capacities, review ICC-ES AC358…
-
How Long does Helical Pier Certification Take?
Read More »: How Long does Helical Pier Certification Take?The provided content does not state the specific duration or time required to complete the helical pier certification program. The program is structured as a multi-stage process involving classroom theory, hands-on field instruction, and written and practical exams to validate…
-
Where can I Find Helical Pier Installation Training?
Read More »: Where can I Find Helical Pier Installation Training?Helical Technology offers on-site helical pier installation training through their professional network. To schedule a training session, you should contact their team directly to arrange for instruction at your next project site. Their program includes both classroom theory regarding geotechnical…
-
What are the Prerequisites for Helical Pier Installer Certification?
Read More »: What are the Prerequisites for Helical Pier Installer Certification?To prepare for helical pier installer certification, you should complete four essential prerequisites designed to align your fieldwork and technical knowledge with regulatory standards. These prerequisites include: Download and use the manufacturer’s design software to model real-time load capacities, soil…