We recommend steel piers over polyurethane foam when a permanent, engineered structural solution is required. While polyurethane foam is an effective tool for filling voids and performing minor, non-structural lifts for concrete slabs (typically under 2 inches), it is not a permanent fix for structural foundation settlement.
Our advanced earth anchoring systems are designed to address the root cause of settlement by transferring building loads past unstable surface soils down to competent load-bearing strata or bedrock. There are three primary reasons why our engineering team and network of structural engineers prefer steel systems:
- Superior Load-Bearing Capacity: Steel helical or push piers can support loads exceeding 100 tons per pier. In contrast, polyurethane foam is generally limited to lifting slabs and supporting lighter loads, typically under 20 tons.
- Stability in Expansive or Wet Soils: In environments with high moisture or expansive clay, shallow solutions like foam can be compromised by soil movement. Steel piers bypass these active zones entirely, providing long-term durability that foam cannot match.
- Permanent Underpinning: Unlike foam, which may degrade or require re-application over time, our ICC and ISO Certified products provide a permanent foundation repair solution. Steel systems are the industry standard for perimeter foundations, load-bearing walls, and commercial columns.
Because every project presents unique geotechnical challenges, we provide Engineering Excellence and Design Support to ensure the right system is utilized.
Consult a structural engineer or the manufacturer’s engineering team for project-specific design and installation guidance. Products are certified to ICC/ISO where indicated — installations must comply with applicable building codes and ICC-ES acceptance criteria (AC358).
Related FAQs
-
Why is Uplift Resistance Critical for Ground Mount Solar Arrays?
Read More »: Why is Uplift Resistance Critical for Ground Mount Solar Arrays?Uplift resistance is a critical design parameter for ground mount solar arrays because these structures are subjected to significant wind uplift forces. Without sufficient resistance, the upward pressure from wind can exceed the vertical load capacity of the foundation, leading…
-
When is a Building Permit Required for a Deck in Omaha?
Read More »: When is a Building Permit Required for a Deck in Omaha?In Omaha and the Eastern Nebraska region, a building permit is specifically required for any deck project that meets either of the following criteria: When applying for a permit in this region, you should be prepared for the following regulatory…
-
What are the Frost Depth Requirements for Deck Footings in Nebraska?
Read More »: What are the Frost Depth Requirements for Deck Footings in Nebraska?In Nebraska, frost depth requirements for deck footings vary by region and local jurisdiction to prevent structural damage caused by frost heave. General requirements across the state include: Compliance with these depths is mandatory under the Nebraska Building Code and…
-
Does a Deck Contractor Handle the Permitting Process for Me?
Read More »: Does a Deck Contractor Handle the Permitting Process for Me?In Nebraska, deck contractors play a vital role in managing the permitting process to ensure projects meet local regulations and avoid costly delays. While the specific level of involvement can vary, experienced contractors typically handle several key aspects of the…
-
What Happens if I Build a Deck without a Permit in Nebraska?
Read More »: What Happens if I Build a Deck without a Permit in Nebraska?Building a deck without a permit in Nebraska can lead to significant safety, financial, and legal issues. Because deck building permits are mandatory for most residential projects in the state, failing to secure one means your project is not in…