To ensure long-term structural stability, we determine soil bearing capacity through a combination of upfront geotechnical investigations and real-time field verification during installation.
Geotechnical Investigation
Before installation begins, we recommend a site-specific geotechnical report to map the soil profile. This process typically includes:
- Standard Penetration Tests (SPT): These assess soil density and relative strength at regular intervals.
- Soil Sampling: Disturbed and undisturbed samples are collected to evaluate cohesive strength in clays or friction angles in granular soils like sand and gravel.
- Strata Identification: Identifying the depth of competent bearing strata and groundwater levels ensures the piers are sized to bypass weak surface soils.
Field Verification: The Torque Factor Method
During installation, we use the Torque Factor Method (Qult = Kt × T) to correlate installation torque with ultimate capacity. Because rotational resistance reflects the soil’s shear strength, the torque required to advance the pier serves as a real-time indicator of the ground’s bearing capacity. We utilize torque factors (Kt) derived from industry standards such as ICC-ES AC358 and ADSC guidelines, which vary by soil type:
- Soft Clay: Typical Kt range of 3–5 ft⁻¹
- Loose Sand: Typical Kt range of 6–10 ft⁻¹
- Gravel: Typical Kt range of 10–15 ft⁻¹
Verification and Compliance
To maintain our commitment to Engineering Excellence and Design Support, we utilize proprietary design software to model these parameters. For critical applications, we may also perform Static Load Tests or Proof Testing to validate that the torque-capacity correlation matches actual performance.
Note: You must consult a structural engineer or our manufacturer’s engineering team for project-specific guidance. All installations must comply with applicable building codes and ICC-ES acceptance criteria.
Related FAQs
-
When should a Contractor or Homeowner Seek a Professional Foundation Inspection for a New Property?
Read More »: When should a Contractor or Homeowner Seek a Professional Foundation Inspection for a New Property?While all new buildings undergo a period of natural settling within the first few years as soil compresses, you should be concerned enough to seek a professional foundation inspection if you observe signs of differential settlement. Unlike uniform settling, differential…
-
Why might Cracks in Drywall or Masonry Appear in a New House During the First Few Years?
Read More »: Why might Cracks in Drywall or Masonry Appear in a New House During the First Few Years?Cracks in a new home typically fall into two categories: normal cosmetic shrinkage or signs of problematic foundation movement. Most buildings experience a degree of normal settling within the first few years as the soil compresses under the weight of…
-
Do Sticking Doors and Windows in a New Home Always Indicate Significant Foundation Settlement?
Read More »: Do Sticking Doors and Windows in a New Home Always Indicate Significant Foundation Settlement?No, sticking doors and windows in a new home do not always indicate significant foundation settlement. While they are recognized symptoms of structural movement, they can also be caused by several non-structural factors. In many cases, doors and windows may…
-
How can I Distinguish between Normal, Harmless Settling in a New Build and Problematic Structural Movement?
Read More »: How can I Distinguish between Normal, Harmless Settling in a New Build and Problematic Structural Movement?Differentiating between normal settling and problematic movement in a new home involves examining the size, shape, and frequency of specific indicators. Most new buildings experience some degree of uniform, vertical movement as the soil compresses, which is typically acceptable. Normal,…
-
What are the Most Common Early Warning Signs of Foundation Settlement in a New Construction Home?
Read More »: What are the Most Common Early Warning Signs of Foundation Settlement in a New Construction Home?While all new homes experience some degree of natural settlement as the soil compresses, distinguishing between normal curing and problematic movement is essential for maintaining your property’s structural integrity. In new construction, the most common early warning signs of significant…