To ensure long-term structural stability, we determine soil bearing capacity through a combination of upfront geotechnical investigations and real-time field verification during installation.
Geotechnical Investigation
Before installation begins, we recommend a site-specific geotechnical report to map the soil profile. This process typically includes:
- Standard Penetration Tests (SPT): These assess soil density and relative strength at regular intervals.
- Soil Sampling: Disturbed and undisturbed samples are collected to evaluate cohesive strength in clays or friction angles in granular soils like sand and gravel.
- Strata Identification: Identifying the depth of competent bearing strata and groundwater levels ensures the piers are sized to bypass weak surface soils.
Field Verification: The Torque Factor Method
During installation, we use the Torque Factor Method (Qult = Kt × T) to correlate installation torque with ultimate capacity. Because rotational resistance reflects the soil’s shear strength, the torque required to advance the pier serves as a real-time indicator of the ground’s bearing capacity. We utilize torque factors (Kt) derived from industry standards such as ICC-ES AC358 and ADSC guidelines, which vary by soil type:
- Soft Clay: Typical Kt range of 3–5 ft⁻¹
- Loose Sand: Typical Kt range of 6–10 ft⁻¹
- Gravel: Typical Kt range of 10–15 ft⁻¹
Verification and Compliance
To maintain our commitment to Engineering Excellence and Design Support, we utilize proprietary design software to model these parameters. For critical applications, we may also perform Static Load Tests or Proof Testing to validate that the torque-capacity correlation matches actual performance.
Note: You must consult a structural engineer or our manufacturer’s engineering team for project-specific guidance. All installations must comply with applicable building codes and ICC-ES acceptance criteria.
Related FAQs
-
Does Nebraska Code Require 42-inch Deck Post Holes?
Read More »: Does Nebraska Code Require 42-inch Deck Post Holes?In Nebraska, building codes generally require deck footings to be placed at a specific depth to prevent damage from frost heave. According to the International Code Council (ICC) digital building codes, the requirements are as follows: Minimum Depth: A minimum…
-
How do Foundation Repair Case Studies Help Get More Jobs?
Read More »: How do Foundation Repair Case Studies Help Get More Jobs?Case studies serve as a powerful tool for foundation repair contractors to move beyond simple sales pitches and provide tangible proof of expertise. They help secure more jobs by performing the following functions: Establishing Social Proof: By featuring before-and-after photos…
-
How do I Market my Certified Foundation Repair Business?
Read More »: How do I Market my Certified Foundation Repair Business?Marketing a certified foundation repair business requires a strategic blend of technical credibility, local search visibility, and data-driven lead generation. By leveraging your certifications and professional partnerships, you can differentiate your services from competitors. To effectively market your business, follow…
-
How does Faulty Soil Investigation Lead to Helical Pier Failure?
Read More »: How does Faulty Soil Investigation Lead to Helical Pier Failure?Faulty or inadequate soil investigation is a leading cause of helical pier failure because it results in inaccurate geotechnical data, which is fundamental to deep foundation performance. According to the provided content, faulty investigation leads to failure through the following…
-
How can a National Installer Network Boost Local Contractor Sales?
Read More »: How can a National Installer Network Boost Local Contractor Sales?Joining a national installer network, such as the one offered by Helical Technology, provides several strategic advantages that boost local contractor sales by enhancing credibility and generating high-quality leads. Key ways the network supports local sales growth include: Instant Marketplace…